Page 95 of 98
Re: Shed Matters 3
Posted: 25 Feb 2024, 07:14
by Stanley
Today started with careful work, using the paper gaskets to mark the locations of the holes that need to be drilled in the castings. I made a mistake at this point in the last engine in the orientation of the two countersunk holes in the front lid and made quite sure I didn't repeat that this morning. I finished up with the back lid in the vise under the drill ready for drilling but that's the first job for tomorrow. There was a sidetrack when I dropped the chuck key and had to search for it and while I was at it I emptied the shop vacuum, it had a good load of cast iron dust in it. I'm satisfied with the morni9ng, now for breakfast!
Re: Shed Matters 3
Posted: 26 Feb 2024, 07:21
by Stanley
Only one image, I was too busy marking and drilling holes. I ended the morning By drilling and tapping for the two 5BA CS screws that are needed in the front end of the cylinder. Now I have to make sure I have got the cylinder oriented correctly but that's for tomorrow. I shall have me breakfast. No mistakes so far!
Re: Shed Matters 3
Posted: 27 Feb 2024, 07:13
by Stanley
Still fitting the front lid.... I drilled and tapped for the 4BA studs and fitted them so that the front lid fitted and the lid registered correctly on the bore of the cylinder. Then I adjusted the holes in the target end of the bed until the cylinder fitted and was correctly oriented with the valve face perpendicular to the bed. It was very close and I soon got a good fit I was very pleased. Tomorrow I shall fit the back lid..... But now, it's breakfast!
Re: Shed Matters 3
Posted: 28 Feb 2024, 07:09
by Stanley
More holes drilled and tapped into the cylinder casting. I drilled and tapped for the studs for the back lid and as you can see they were a good fit. Then I got set up for drilling and tapping for the long studs that will hold the steam chest and lid onto the cylinder. That's ready now for tomorrow morning's start. Now for breakfast!
Re: Shed Matters 3
Posted: 29 Feb 2024, 06:50
by Stanley
The target this morning was the fitting of the steam chest on its studs and the fit of the valve chest lid. I drilled and tapped under the pillar drill, drilled the clearance holes in the walls of the chest and put it all together. It was a perfect fit and didn't need any easing. Very pleased and rather than crash on I called it a day and declared it breakfast time!
Re: Shed Matters 3
Posted: 01 Mar 2024, 06:01
by Stanley
Sorry Lads! No shed today, I am being entertained by the news......
Re: Shed Matters 3
Posted: 02 Mar 2024, 07:20
by Stanley
Re: Shed Matters 3
Posted: 03 Mar 2024, 06:50
by Stanley
Only one thing done this morning (Apart from putting my chicken in to roast!) and that was to fit the piston rod gland on its studs. I got it right first time, no need for any easing. That's good. Now for breakfast.
Re: Shed Matters 3
Posted: 04 Mar 2024, 07:08
by Stanley
Re: Shed Matters 3
Posted: 05 Mar 2024, 07:01
by Stanley
Only one image needed this morning after marking, drilling and tapping the valve chest and valve rod gland and ending up after fitting with the cylinder looking fully equipped externally at closing time. Slow and careful but it's working! Now for breakfast.
Re: Shed Matters 3
Posted: 06 Mar 2024, 07:09
by Stanley
Re: Shed Matters 3
Posted: 07 Mar 2024, 07:12
by Stanley
We spend most of our time making castings smaller and this morning was more of the same. I cut the valve down to the correct size for the valve chest and then cut the 1/4" slot in the top for the driver bar which will accept the valve rod. More chewing away at the valve tomorrow! Now it's breakfast.
Re: Shed Matters 3
Posted: 08 Mar 2024, 07:09
by Stanley
Re: Shed Matters 3
Posted: 09 Mar 2024, 07:22
by Stanley
Re: Shed Matters 3
Posted: 10 Mar 2024, 07:02
by Stanley
Re: Shed Matters 3
Posted: 11 Mar 2024, 07:27
by Stanley
Re: Shed Matters 3
Posted: 12 Mar 2024, 07:04
by Stanley
More work refining the valve train. I finished work on the clevis that connects the valve rod to the eccentric rod. Then I fitted it to check what I'd done. I finished up with the cylinder and valve train finished. I can move on now with the other elements. Time for breakfast.
Re: Shed Matters 3
Posted: 13 Mar 2024, 07:23
by Stanley
Re: Shed Matters 3
Posted: 14 Mar 2024, 07:21
by Stanley
Re: Shed Matters 3
Posted: 15 Mar 2024, 07:10
by Stanley
1
More refining of the crosshead. Mainly reducing the size of the blank starting with cutting my mistake off! Then the other faces measured marked and cut both by hand with the hacksaw and finishing cuts on the mill. I also marked the position of the crosshead pin and drilled the head and tapped it 4BA. I can cut one side to clearance as is needed after I have cut the slot in it for the eye of the connecting rod. It fits and runs nicely. I shall cut the slot tomorrow and then make the connecting rod. But now it's time for breakfast!
Re: Shed Matters 3
Posted: 16 Mar 2024, 07:17
by Stanley
As usual, some careful measuring and marking, this morning for the slot in the crosshead that accepts the small end of the connecting rod. Then some careful milling , enlarging one side of the drilling for the crosshead pin, then providing a pin and fitting it. I'm happy to report it has all turned out as near perfect as I could wish. I shall make the crosshead look pretty tomorrow but mechanically it couldn't be any better. A nice morning with very good results. Now I deserve my breakfast!
Re: Shed Matters 3
Posted: 17 Mar 2024, 07:05
by Stanley
Only one image needed this morning. I have finished the crosshead, refined it's shape and made it pretty. Then I worked my way through refitting the whole of the engine as finished so far making sure that all the fastenings worked and fitted correctly. This isn't the final fitting with gaskets but is the next thing to it. It's wonderful how many snags you can find. I am ready now to move on with the connecting rod and main bearing. I shall start that tomorrow. Now I'm interested in breakfast!
Re: Shed Matters 3
Posted: 17 Mar 2024, 10:34
by BobH
Coming along nicely Stanley. I haven't done much on the trailer recently, what with hospital appointments but those are over for the time being. I did get diverted onto our multi fuel stove when the front glass cracked. A replacement glass was relatively easy to buy but then 3 of the 4 fixings studs sheared off in spite of a long soak with Penetrol. There was nothing for it but to take the trailer wheel off the mill where I was about to drill the oil holes and set up to drill the studs out. Some careful setting up payed off, I think I got the drill pretty central. I started with a face mill, then a centre drill then 4mm and finally 5mm to retapped M6 as per the originals.
20240305_111130.jpg
20240305_111305.jpg
20240305_111150.jpg
Re: Shed Matters 3
Posted: 17 Mar 2024, 11:29
by Stanley
Those stove fastenings are made to seize and break Bob. I had the beginnings of that problem with mine but was lucky and managed to get away with it. I don't know about yours but I think it was the corrosion in the clips that held the glass that broke the glass while the stove was stood idle....
Nice to see you back to normal duties Bob. Fingers crossed!
Re: Shed Matters 3
Posted: 18 Mar 2024, 07:12
by Stanley
Only one image needed again. I decided to have a change and do a bit of turning. So I set to to make the connecting rod. This has to be chopped out of the stock they supply, a piece of bar 1" X 3/4". The first job as usual was some careful measuring and making a fag packet drawing. Then mount the steel in the lathe and do some marking up. Then I could start marking with the tool and then actually reducing the Bar to the size of the rod. All that took an hour but I think I have it right. No rush, I can come at it fresh tomorrow. Now for breakfast.