Boiler35881910

Boiler35881910
Resetting the boiler at Ellenroad in 1988. Almost finished, the side flue tiles are in place, insulated with ash and the slag wool is there to allow movement as the boiler expands. More ash to go on and then the flags on top.
Chimney35910705
Weavingsheddoormessages769103
User avatar
Stanley
Global Moderator
Global Moderator
Posts: 99633
Joined: 23 Jan 2012, 12:01

Boiler35881910


16 Mar 2014, 06:05
531

Return to “Other Objects”