Hi Stanley, looks like you have been busy and getting plenty done

, the engines are looking good . I think you deserve a rest to do a bit of writing.
I have been distracted a bit but its all related to the lathe getting done, I have various chucks , vices , rotary table etc lying allover the place, a friend donated some 40mm square box section he got from work so I have been making a shelf unit to store all the chucks etc on.
The used box section.
Cut up into component sizes and laid out on full size drawing on the floor to be tack welded.
The floor is very out of level so I have welded large nuts into the bottom of the legs , this shot shows them just tack welded but they are fully welded and then the shelf unit can be levelled by large bolts.
The finished 'bolt feet' all four can be altered so the frame will sit level with no rocking.
The finished welded frame sitting on the adjustable feet.
I painted a coat of etch primer on the frame with a small roller.
Then two coats of Machinery green , the colour I paint most things

just so things look standard in the workshop.
Then 18mm plywood shelves were self tappered down onto the framework.
I then had some alloy chequer plate off cuts from the scrapyard that almost covered the shelves so drilled and ring shank nailled them to the plywood, the heavy stuff will slide better on this than the wood surface.
The finished self unit in position , the things on it are not in the final places and the rotary table on the trolly by the shelf unit is too heavy for one person to lift. The box section is heavy walled stuff and all joints are fully seam welded around so I think this unit would withstand a nuclear blast

cheers Mick